DWR Progress

After about 8 hours in the car, I made a lot of progress on my DWR. I am already halfway done!

20130804-220201.jpg
I think its turning out really nice! Again this is my first time EPP and its going well. The basting (thread basted) was a little tricky at first, but it got easier as I went along.

20130804-220631.jpg
Tomorrow I’m leaving for a 6-hour road trip so hopefully I’ll finish the piecing in that time frame.

While I was away, I visited the shop where I bought my fabrics for my first quilt, so it was a nice visit. Not to mention I bought some fabric!

20130804-221647.jpg
I bought these fabrics to go with my DWR quilt. The blue will be the background (something blue!) and I think its the perfect blue to make everything pop! I also needed on more gold fabric to go in between the rings, so I thought that fabric would look nice, even though it is a whiter back ground.

20130804-221857.jpg
I’m loving my fabric pull!

I also got some fat quarters for the lesson quilt (#3). I’ll have more on that quilt later.

20130804-222653.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s